BLH Stop Drop Barricading installed on Rowan Drillings Jack up rig: Rowan Gorilla 6.
The project has been part of ConocoPhillips continues work for improved safety, and an integrated part of ConocoPhillips and Rowan Drillings extensive dropped object prevention programs.
The installation of BLH Stop Drop Barricading system completed in Rotterdam, with assistance from DOM Group Offshore, WestOne and Offshoretech BV.
High-risk areas secured and we wish the Rowan Gorilla 6, safe operations in Norway, with ZERO dropped Objects.