Mathew Hodgetts is Outage Manager for the refurbishment of Hydro Tasmania Pty Ltd’s 26 Hydro plants in Tasmania. Mathew describes the BLH Safety Barricading System as a major factor in their strive for Zero Accidents and the safety of their plants. Within a two years period the barricading system will be installed on all their Hydro Plants. Paloona Power Station and BLH Safety Solutions are setting the required standard.